Earned Value Management Examples

Net Present Value Outcome Analyzer Views

Progress

Introduction
This tool generates a variety of net present value stock statistics for DevTreks outcomes.

Calculation View Description
v214a

Version: 1.7.0

Feedback About commercial/outcomegroup/Earned Value Management Examples/37/outcomenpvprogress1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:
Display Full View:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions (beta)

Step 1

  • Step 1. The accompanying tutorial contains a reference that explains these analyzers.
  • Step 1. Base Calculations To Analyze: Make sure that the data being analyzed corresponds to outputs.
  • Step 1. Analysis Type:The Analysis Type that is saved should match the name of this analyzer.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Earned Value Management Examples
Outcome Group : Earned Value Management Examples ; EVM01
Outcome AllAlt. 0Alt. 1Alt. 2Alt. 3Alt. 4Alt. 5Alt. 6
Name 2013, Q1 RR Track Actual2013, Q1 RR Track Planned2013, Q2 RR Track Actual2013, Q2 RR Track Planned2013, Q3 RR Track Actual2013, Q3 RR Track Planned2013, Q4 RR Track Planned
Date 03/30/201303/30/201306/30/201306/30/201309/30/201309/30/201312/31/2013
Label A1010A1010A1010A1010A1010A1010A1010
Observations 1111111
Target actualbenchmarkactualbenchmarkactualbenchmarkbenchmark
R Plan Period 1,001,890.261,001,890.261,001,890.261,001,890.261,001,890.261,001,890.261,001,972.52
R Plan Full 4,007,643.304,007,643.304,007,643.304,007,643.304,007,643.304,007,643.304,007,643.30
R Plan Cumul 1,001,890.261,001,890.262,003,780.522,003,780.523,005,670.783,005,670.784,007,643.30
R Actual Period 330,623.780.00333,629.460.00333,629.460.000.00
R Actual Cumul 330,623.780.00664,253.240.00997,882.700.000.00
R Actual Period Change -671,266.480.00-668,260.800.00-668,260.800.000.00
R Actual Cumul Change -671,266.480.00-1,339,527.280.00-2,007,788.080.000.00
R Plan P Percent 33.000.0033.300.0033.300.000.00
R Plan C Percent 33.000.0033.150.0033.200.000.00
R Plan Full Percent 8.250.0016.570.0024.900.000.00
Output Q Plan Period 2.002.002.002.002.002.002.00
Output Q Plan Full 8.008.008.008.008.008.008.00
Output Q Plan Cumul 2.002.004.004.006.006.008.00
Output Q Actual Period 2.000.002.000.002.000.000.00
Output Q Actual Cumul 2.000.004.000.006.000.000.00
Output Q Actual Period Change 0.000.000.000.000.000.000.00
Output Q Actual Cumul Change 0.000.000.000.000.000.000.00
Output Q Plan P Percent 100.000.00100.000.00100.000.000.00
Output Q Plan C Percent 100.000.00100.000.00100.000.000.00
Output Q Plan Full Percent 25.000.0050.000.0075.000.000.00
Incent Plan Period 1,001,890.261,001,890.261,001,890.261,001,890.261,001,890.261,001,890.261,001,972.52
Incent Plan Full 0.000.000.000.000.000.000.00
Incent Plan Cumul 0.000.000.000.000.000.000.00
Incent Actual Period 0.000.000.000.000.000.000.00
Incent Actual Cumul 0.000.000.000.000.000.000.00
Incent Actual Period Change 0.000.000.000.000.000.000.00
Incent Actual Cumul Change 0.000.000.000.000.000.000.00
Incent Plan P Percent 0.000.000.000.000.000.000.00
Incent Plan C Percent 0.000.000.000.000.000.000.00
Incent Plan Full Percent 0.000.000.000.000.000.000.00
Net Plan Period 1,000,000.001,000,000.001,000,000.001,000,000.001,000,000.001,000,000.001,000,000.00
Net Plan Full 4,000,000.004,000,000.004,000,000.004,000,000.004,000,000.004,000,000.004,000,000.00
Net Plan Cumul 1,000,000.001,000,000.002,000,000.002,000,000.003,000,000.003,000,000.004,000,000.00
Net Actual Period 1,000,000.000.001,000,000.000.001,000,000.000.000.00
Net Actual Cumul 1,000,000.000.002,000,000.000.003,000,000.000.000.00
Net Actual Period Change 0.000.000.000.000.000.000.00
Net Actual Cumul Change 0.000.000.000.000.000.000.00
Net Plan P Percent 100.000.00100.000.00100.000.000.00
Net Plan C Percent 100.000.00100.000.00100.000.000.00
Net Plan Full Percent 25.000.0050.000.0075.000.000.00
Dataset: Earned Value Management Examples IRI This recreation benefit estimate is computed using life cycle cycle totals, statistics, incremental change, and progress outcome analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.